Cadence - Fact sheet

Alto is a future high-speed rail network that is nearly 1,000 kilometres long in the Québec City–Toronto corridor.

Cadence is the group of companies selected as a private developer partner to be in charge of the design, execution and operation of the various project phases in conjunction with the federal Crown corporation Alto. 

Cadence’s members include CDPQ Infra, AtkinsRéalis, SYSTRA Canada, Keolis Canada, SNCF Voyageurs and Air Canada. 

cadence.info

Our role: 
CDPQ Infra assumes the leadership of the Cadence consortium. 


1,000 km
of exclusive electrified tracks


300 km/h
or more as peak speed


7 connected cities:
Québec, Trois-Rivières, Laval, Montréal, Ottawa, Peterborough and Toronto


2029
planned commissioning of first segment (Montréal to Ottawa)


Current stage

The project is currently in the development and pre-construction phase, which is expected to last until 2029. At this stage, Cadence is working with Alto to refine the route, design and technical specifications for the future high-speed rail.

Learn more

Documentation

Studies

Studies under way

Reference documents

See all documents

Other projects that make society move forward

Réseau express métropolitain

Greater Montréal, Canada

TramCité

Québec, Canada